Location: Guisborough
Project Overview
HLA Services delivered another successful turnkey air conditioning upgrade project at Guisborough, where a complete system replacement was completed within an extremely tight schedule to minimise operational impact.
Key Works Completed
- Rapid removal of existing AC systems – All existing air conditioning equipment safely decommissioned and removed during half-term period
- Installation of new Toshiba Quad system – Advanced multi-split solution providing comprehensive climate control across the facility
- Full electrical installation by HLA electricians – Complete power infrastructure installed to support the new system
Turnkey Project Delivered
As a turnkey contractor, HLA Services managed every aspect of the project:
- Rapid execution within a half-term shutdown window
- Coordinated works to complete within tight deadlines
- Full electrical installation and integration
- Comprehensive testing and commissioning before reactivation
Why Choose HLA Services?
Our integrated approach ensures:
- Single-point responsibility from removal through to commissioning
- Cross-disciplinary expertise delivered on time and to schedule
- Specialised contractors working in tandem for seamless execution
- Guaranteed performance standards achieved under pressure
Benefits Delivered
The project has resulted in:
- Modern, efficient air conditioning infrastructure
- Year-round climate control with the new Toshiba Quad system
- Minimal disruption to operations (completed within half-term)
- Reduced energy consumption through advanced technology
- A future-ready AC system ready for immediate use
For more information see our Air Conditioning or contact HLA Services on 0191 548 6699 or via email.