Choose one of our case studies below covering many of HLA’s Services:
- Case Study – Mobile Welding/Grinding Extraction
- Case Study – LEV Testing
- Case Study – Personnel Down-Draught Cleaning Booth
- Case Study – Dust Extraction – Fibre Glass Sanding
- Case Study – Dust Extraction – Stone Dust
- Case Study – Dust Extraction – Food Process
- Case Study – Heat Pumps Installation in Team Valley
- Case Study – Air conditioning, cold room and refrigeration, plumbing, ductwork and catering equipment at Glasgow Airport
- Case Study – Air conditioning for offices in Morpeth
- Case Study – North East Air Ambulance Service
- Case Study – Energy Efficient Water Heaters
- Case Study – Air conditioning for the NHS offices at Regent Point, Newcastle
- Case Study – Air conditioning install at a North Tyneside hospital offices
- Case Study – Heat Pumps
- Case Study – Catering Equipment – School dishwasher installation
- Case Study – Duct Work – Install of Supply Vent and Louver Relocation
- Case Study – Temperature control for call centre offices, Boldon
- Case Study – Bedson Building – McQuillan Laboratory
- Case Study – Devonshire Building – Synthetic Biology Laboratory
- Case Study – Marjorie Robinson Reading Rooms
- Case Study – LEV Oil Mist
- Case Study – Hotel Ventilation
- Case Study – Evaporative Cooling
- Case Study – Refrigeration / Ventilation
- Case Study – Catering Equipment – Dishwasher Installation
- Case Study – Catering Equipment Install at Hebburn Comprehensive
- Case Study – Air Conditioning
- Case Study – Electrical
- Case Study – Hard Facilities Management
- Case Study – Heating
- Case Study – Pipe Work
- Case Study – Plumbing
- Case Study – Renewable Energy
- Case Study – Ventilation