Location: Guisborough

Project Overview

HLA Services delivered another successful turnkey air conditioning upgrade project at Guisborough, where a complete system replacement was completed within an extremely tight schedule to minimise operational impact.

Key Works Completed

  • Rapid removal of existing AC systems – All existing air conditioning equipment safely decommissioned and removed during half-term period
  • Installation of new Toshiba Quad system – Advanced multi-split solution providing comprehensive climate control across the facility
  • Full electrical installation by HLA electricians – Complete power infrastructure installed to support the new system

Turnkey Project Delivered

As a turnkey contractor, HLA Services managed every aspect of the project:

  • Rapid execution within a half-term shutdown window
  • Coordinated works to complete within tight deadlines
  • Full electrical installation and integration
  • Comprehensive testing and commissioning before reactivation

Why Choose HLA Services?

Our integrated approach ensures:

  • Single-point responsibility from removal through to commissioning
  • Cross-disciplinary expertise delivered on time and to schedule
  • Specialised contractors working in tandem for seamless execution
  • Guaranteed performance standards achieved under pressure

Benefits Delivered

The project has resulted in:

  • Modern, efficient air conditioning infrastructure
  • Year-round climate control with the new Toshiba Quad system
  • Minimal disruption to operations (completed within half-term)
  • Reduced energy consumption through advanced technology
  • A future-ready AC system ready for immediate use