HLA Services recently completed a full mechanical and electrical installation as part of the 3rd and 4th-floor refurbishment at 1 St James Gate, Newcastle. The project included heating, cooling, electrical, and plumbing solutions to enhance the functionality of the space.

Our Solution

HLA installed a comprehensive system, including:

  • Samsung VRF Wind-Free Heat Pumps – Providing efficient heating and cooling throughout the building.
  • Server Room Split Systems – Ensuring reliable cooling for critical IT infrastructure.
  • Full Electrical Installation – Delivering power and lighting solutions tailored to the refurbishment.
  • Data Infrastructure – Seamless connectivity with structured cabling throughout.
  • Kitchenette Plumbing & Drainage – Including ziptaps and Wudu facilities for enhanced convenience.

Results & Impact

The installation was completed efficiently, meeting all project requirements. The upgraded heating, cooling, electrical, and plumbing systems provide a modern, energy-efficient solution for the refurbished office space.

For more information see our Electrical Services or contact HLA Services on 0191 548 6699 or via email.

 

For more information see our Mechanical Services or contact HLA Services on 0191 548 6699 or via email.