Project Overview

HLA Services recently completed the installation of a comprehensive gas safety system within an existing plantroom, upgrading the facility to meet current safety regulations and compliance standards.

The project was designed to enhance operational safety by implementing reliable gas detection and emergency shutdown measures, ensuring the plantroom can respond rapidly to any fault or gas leak scenario.

Key Works Completed

  • Installation of a complete gas safety panel – Providing centralised control and monitoring
  • Gas detection sensors fitted throughout the plantroom – Enabling early leak detection
  • Emergency stop systems installed – Allowing immediate manual shutdown when required
  • Gas solenoid valve integration – Ensuring automatic isolation of gas supply in fault conditions
  • Full system commissioning and testing – Verifying safe and effective operation

Why Choose HLA Services?

Our team delivered the project using fully qualified in-house electricians and Gas Safe engineers, ensuring:

  • Seamless coordination between electrical and gas works
  • Efficient project delivery with minimal disruption
  • Full compliance with current safety regulations and standards

Benefits Delivered

The upgraded system provides:

  • Enhanced safety through rapid gas leak detection and automatic shutdown
  • Full compliance with modern gas safety regulations
  • Increased reliability and peace of mind for plantroom operations
  • A robust, future-proof safety solution