Location: South Gosforth, North East

Project Overview

HLA Services recently completed a critical air conditioning replacement project within a live metro control room environment in the South Gosforth. The project involved upgrading an existing system to a Mitsubishi Electric twin split air conditioning system, ensuring reliable climate control for a sensitive operational space.

Due to the nature of the facility, all works were carefully scheduled and delivered during engineering hours on a night shift basis, minimising any disruption to essential services.

Key Works Completed

Replacement of existing AC system – Installation of a modern Mitsubishi Electric twin split system for improved performance and reliability

Night shift installation – All works carried out during engineering hours to maintain uninterrupted operations

Custom fabrication and installation – Bespoke protective cage manufactured by HLA Services for external condensing units, finished with a durable powder coating

Turnkey project delivery – Full project management from removal to installation, testing, and commissioning

Why Choose HLA Services?

Our team delivered this project with a strong focus on:

  • Working within highly sensitive, operational environments
  • Careful planning and execution to meet strict access and time constraints
  • Providing bespoke fabrication solutions alongside HVAC expertise
  • Maintaining the highest standards of safety and compliance

Benefits Delivered

The completed project has provided:

  • Reliable and efficient climate control for a critical control room environment
  • Minimal operational disruption through out-of-hours installation
  • Enhanced protection of external equipment via a custom-fabricated cage
  • A robust, long-term solution using trusted Mitsubishi Electric technology