Client: St John the Evangelist Church, Kingston Park

In a local church two old, inefficient boilers were replaced with high-efficiency models featuring a 10:1 modulation ratio to enhance energy efficiency and meet varying heating demands.

The outdated flues were replaced with condensing flues, the old flues were removed and bricked up to match the existing structure.

A new circulation pump and an inline magnetic filter were installed to optimize water flow and protect the system from debris.

Electrical and control systems were upgraded to integrate the new boilers with the existing Building Management System (BMS).

The new system significantly reduced energy consumption and enhanced the building’s overall heating efficiency.

All works were carried out in-house by our experienced team, ensuring a smooth and efficient project completion.

For more information see our Commercial Heating Services or contact HLA Services on 0191 548 6699 or via email.