Location: Sunderland, Tyne and Wear

Project Overview

HLA Services was contracted to upgrade the catering facilities at a primary school in Sunderland, replacing an ageing sterilising sink and an existing 5.8m run of worktop with a new commercial dishwasher system and stainless steel benching.

The project involved removing the existing equipment and installing a new Maidaid C205WS commercial pass-through dishwasher, alongside newly fabricated benching to provide a modernised and practical catering area.

To minimise disruption to the school’s normal operations and get the dishwasher back into use as quickly as possible, HLA allocated additional engineers to the installation, allowing the work to be completed in approximately five hours.

Scope of Work

  • Removal of Existing Equipment – Removal of the existing sterilising sink and approximately 5.8m run of ageing worktop.
  • Commercial Dishwasher Installation – Installation of a new Maidaid C205WS commercial pass-through dishwasher.
  • New Stainless Steel Benching – Installation of new fabricated benching to complement the dishwasher and provide an improved working area.
  • Equipment Integration – Installation of the new dishwasher system alongside the replacement benching to provide a complete catering equipment upgrade.
  • Additional Engineering Resource – Allocation of additional engineers to complete the installation as efficiently as possible and minimise disruption to the school.

Results & Benefits

The project delivered:

  • Replacement of an ageing sterilising sink and 5.8m run of existing worktop.
  • Installation of a new Maidaid C205WS commercial pass-through dishwasher.
  • New stainless steel benching to modernise the catering area.
  • Improved catering facilities with updated commercial equipment.
  • Additional engineering resources to accelerate the installation.
  • Installation completed with minimal disruption to the school’s operations.

HLA Services provided a complete catering equipment installation, transforming an ageing kitchen area into a modernised and practical workspace. By allocating additional engineers, HLA completed the work efficiently, helping the school minimise disruption and return its dishwasher facilities to use quickly.

Customer Testimonial

“HLA were outstanding from start to finish with this dishwasher installation at a primary school in Sunderland.

The full job was carried out in a safe and professional manner. Additional engineers were assigned to ensure the installation was completed as quickly as possible, and the work was completed in around five hours. This helped minimise disruption to the school’s daily operations and ensured the dishwasher was back in use quickly.

Tom was extremely professional, keeping a line of communication open with the caretaker and providing regular updates throughout. The engineers who carried out the job were also fantastic, and I could not recommend HLA enough for anyone needing any works carried out at their place of business.”