Location: South Gosforth, North East
Project Overview
HLA Services recently completed a critical air conditioning replacement project within a live metro control room environment in the South Gosforth. The project involved upgrading an existing system to a Mitsubishi Electric twin split air conditioning system, ensuring reliable climate control for a sensitive operational space.
Due to the nature of the facility, all works were carefully scheduled and delivered during engineering hours on a night shift basis, minimising any disruption to essential services.
Key Works Completed
Replacement of existing AC system – Installation of a modern Mitsubishi Electric twin split system for improved performance and reliability
Night shift installation – All works carried out during engineering hours to maintain uninterrupted operations
Custom fabrication and installation – Bespoke protective cage manufactured by HLA Services for external condensing units, finished with a durable powder coating
Turnkey project delivery – Full project management from removal to installation, testing, and commissioning
Why Choose HLA Services?
Our team delivered this project with a strong focus on:
- Working within highly sensitive, operational environments
- Careful planning and execution to meet strict access and time constraints
- Providing bespoke fabrication solutions alongside HVAC expertise
- Maintaining the highest standards of safety and compliance
Benefits Delivered
The completed project has provided:
- Reliable and efficient climate control for a critical control room environment
- Minimal operational disruption through out-of-hours installation
- Enhanced protection of external equipment via a custom-fabricated cage
- A robust, long-term solution using trusted Mitsubishi Electric technology