Project Overview

HLA Services recently completed a full plantroom refurbishment at Durham Cricket Club, delivering a modern, energy-efficient heating solution designed to enhance system performance, reliability, and long-term operational efficiency.

The project involved the complete strip-out of the existing plantroom infrastructure, including boilers, water heater, and flue dilution system. Our team then designed and installed a fully upgraded plantroom tailored to meet the client’s current and future requirements.

Key Works Completed

  • Plantroom strip-out – Safe removal and disposal of existing boilers, water heater, and flue dilution system
  • Boiler installation – Supply and installation of 3 x 150kW high-efficiency AIC boilers to improve system performance and energy efficiency
  • Controls and electrical upgrades – Installation of a new BMS control panel, distribution board, gas interlock system, and upgraded plantroom lighting
  • Heating system improvements – Installation of new pumps and control valves to each heating zone, providing enhanced control and operational efficiency
  • Domestic hot water upgrade – Supply and installation of a new 1000-litre DHW cylinder to meet site demand
  • Flue system design – Design and installation of a new flue system compatible with the upgraded plant
  • Plantroom refurbishment – Full internal decoration including wall finishes and painted flooring for a clean, professional environment
  • Commissioning and handover – Complete system testing, commissioning, and client handover ensuring optimal performance from day one

Why Choose HLA Services?

Our team delivered this project with a strong focus on:

  • Delivering energy-efficient, future-proof mechanical solutions
  • Careful planning and execution within an operational environment
  • High-quality workmanship across mechanical, electrical, and finishing elements
  • Full compliance with industry standards and safety requirements

Benefits Delivered

The completed project has provided:

  • A fully modernised, energy-efficient plantroom
  • Improved system reliability and performance
  • Greater control over heating zones and energy usage
  • Simplified maintenance and improved long-term asset management
  • A clean, safe, and professionally finished plantroom environment

For more information see our Mechanical Services or contact HLA Services on 0191 548 6699 or via email.