Client: Fairstone

Project Brief: To solve the problem of high temperatures in the office areas and computer suite.

Actions: The installation of six Fujitsu void mounted split system heat pumps. This solved the high temperature problem and allowed the areas to be maintained at 21°C

For more information see our Air Conditioning or contact HLA Services on 0191 548 6699 or via email.